San Diego Has Released Its Draft Bike Plan. Here’s Where It Needs to Go Further.
The City of San Diego has officially released its 2026 Draft Bicycle Master Plan Update, and the public comment window is now open through Monday, November 30. Final adoption is expected sometime in 2027.

A recent San Diego State University study (previous coverage) found that the City completed 75% of the bike infrastructure called for in its 2013 master plan. That might seem like a low number, and the city could certainly be doing better, but there are also plenty of cities that are doing worse. Los Angeles passed its bike master plan in 2011 but is stuck in the single digits on implementing its own plan.
The city is now seeking comment on a new 2026 draft. It expands the planned Class IV network (separated or protected bike lanes), ties into regional trails, and establishes a solid, data-driven scoring system to prioritize projects. The City deserves credit for strengthening the 2013 plan and for recognizing that quick-builds and street resurfacing are vital tools to get paint and posts on the ground faster.

But while the city is making progress, the data also shows a major gap. While over 80% of major streets have some sort of bikeway, only 8% of it is physically protected. More than 30% of the network is still considered high-stress — meaning nearly a third of streets feel unsafe or intimidating to ride on, largely because of fast traffic, high car volumes, and lanes with no physical protection separating bikes from vehicles. As the City looks ahead to the next decade, it needs to shift from just counting miles to building a truly connected, low-stress network.
To make this good plan great, here is where it needs to go further:
Adams Avenue Must Be A Protected Bike Lane
The City upgraded the Adams Avenue recommendation from an earlier Class III (bike boulevard) concept to include Class II (painted) bike lanes where width allows. That is a meaningful improvement. But Adams is a major connection between University Heights and North Park, and residents and the Mobility Board, an advisory body to the Mayor and City Council that reviews transportation and street safety policies, specifically requested a Class IV facility.

Make Protected Bike Lanes the Standard
On any high-speed, high-volume, or high-stress street, physically separated bikeways should be the default. If City staff propose a less protective facility, they should have to document the specific engineering reason why the lanes cannot be built.

Furthermore, the current draft still gives weight to minimizing impacts to on-street private car storage parking when final designs are developed. Safety and adopted design standards should come first. Private car storage parking concerns alone should never dictate whether a street gets a protected bike lane.
Extend Mission Boulevard Concept to Turquoise Street

In District 1, local advocates are focused on a specific geographic gap. Respect Bird Rock is requesting that the City extend the proposed Mission Boulevard bikeway north to Turquoise Street. Right now, the draft stops the protected lane proposal at Loring Street, which misses the world-renowned and high-traffic Tourmaline Surf Park, as well as new and proposed residential developments. Stopping at Loring is a missed opportunity for a continuous coastal route, especially with recent increased restrictions on boardwalk riding.
Connect the Coast: Fix the Pacific Highway Corridor
A common theme in public feedback whenever bike lanes or mobility options are discussed is the desperate need for a safe, continuous route from Downtown and the South Bay to the beaches—Ocean Beach, Pacific Beach, and La Jolla. Right now, Pacific Highway is the main artery, and it is inadequate for anyone not in a car.

The draft plan acknowledges this. It notes that Pacific Highway scored incredibly high in prioritization and public support, but the City excluded it from the new conceptual designs because it has “already been extensively studied.” But studied doesn’t mean implemented.
The final plan really should commit to a physically separated route connecting the urban core to the coast. For example, the North to South Corridor pictured above has copious space on the federally owned land that could accommodate a safe corridor with strategic partnerships.
Making the River Trail Vision a Reality
The draft plan shows a photo of the San Diego River Trail as a premier Class I (off-street bike path) facility, providing a safe, separated backbone for the citywide network. But a trail is only as good as its weakest link.
The Connect the Trail campaign is working to close the remaining gaps in the trail’s “Western 9” segment, specifically the West Valley River Crossing (Project AT052). The draft plan notes that gaps “disrupt otherwise safe and connected routes“. Right now, that missing crossing forces families and commuters onto hazardous roads.

The campaign recently secured a major win—City Council funding for the West Valley River Crossing design study—proving that community advocacy works. As we push for a bold final plan, we must ensure this crossing remains a priority. We need to measure success by the critical gaps we close, not just total miles built.
Require Durable Protection for Permanent Facilities.
Flex posts, bendy plastic bollards that separate bike lanes from cars-cheap and fast to install- can be useful for quick-build projects, but they aren’t permanent infrastructure. When the City builds permanent protected facilities, they need durable separation like concrete, raised bikeways, or planters.
Make Resurfacing an Automatic Complete Streets Opportunity
The draft currently says installing bikeways during street resurfacing “can be considered.” That is too vague and discretionary.
When the City repaves a street that is part of the planned bicycle network, staff should evaluate installing the bikeway at the same time. If they don’t, they should explain why. These are the most economical and efficient times to build.
Pair the Plan with a Timeline and Funding Strategy
The final plan should identify which projects are expected to move forward over the next decade, likely funding sources where possible, and which projects are best suited for quick-build versus capital delivery. If we don’t put a timeline and a budget behind these lines on the map, they are less likely to get built.
Publish the List and Measure Connectivity

The City has built a strong scoring methodology based on safety, equity, connectivity, and public input. Now, they need to publish the actual prioritized project list, enabling residents to track progress with annual delivery targets.
Finally, success shouldn’t just be measured by total lane miles. The City should report on how many critical gaps are closed each year, where those gaps sit, and how much continuous, low-stress network is created.
How to make your voice heard:
This is an important opportunity to help shape San Diego’s long-term bikeway network before it is finalized.
Everyone – locals and visitors – can review the draft plan and share your feedback through the City of San Diego Comment Portal. The public comment period is open through November 30, 2026, with adoption expected in 2027.

